translate翻訳ツール

機械翻訳のため、内容の正確性を保証するものではありません。
正確な翻訳を希望する場合はこちらからバイリンガルを探してください。
arrow_downward
タイトル
メッセージの内容
タイトル
メッセージの内容
確認
メッセージの内容
Loading..
 

メッセージで相談する

  • schedule ステータス:
    受注可能
  • 評価 :
  • 受注実績 : 0件
  • ミャンマー
  • お気に入り : 0件
スキル
ホームページ制作
サイト管理・運営
フリーランス指名案件
  • 最終ログイン : 2021-09-13
  • 登録日 : 2021-09-13

職歴

詳細

Sittaung Company Limited

Lead Installation Engineer

2020/05~ 2021/01

•Collaborate with solar PV Project Engineers and Development Managers to provide project support for development, design and cost estimation activities.•Assist Project Development Managers with technical aspects of customer presentations.•Assist Project Development Managers in writing and preparing exhibits for proposals and contracts.•Ensure compliance with company, industry, trade, and jurisdictional safety standards, practices,codes.•Develop technical specifications and scopes of work for engineering firms and contractors, and review supplier/vendors data sheets.•Provide on-site support for solar PV system commissioning, troubleshooting,power quality site analysis, and remediation.•Engineering support during construction, system commissioning and troubleshooting.•Implemented pilot installation with all team leader then inspection with client.

Petrochemical Engineering Construction

Petrochemical Engineering Construction

2018/05~ 2020/03

Materials control of piping., • Checked the Iso drawing and then provide the materials for fabrication.• Planning to take up construction development work of fabrication shop.• Checked the Iso drawing and then compare with the spools after fabrication at the workshop.• Managed the transportation for the spools to the main company site.• Applied the permit for the transportation at the site.• Applied the permit for cold & hot work at the site.• Implemented the reinstatement(TFA) after installed the spools at the site.• Checked the structure drawing and provide the materials for installation at the site.• Checked the structure drawing and then compare with the materials for report.• Implemented the cost estimate and submit to the client.• Discuss the job pack with client and arrange the third party for job required

ICT star group Myanmar Co. Ltd.

Engineer

2016/07~ 2018/03

• Implemented HT/LT line installation for Myanmar Post Telecommunication(MPT), Technical site survey report for electrical and civil work, consider the power upgrading, civil work renovation.• Implemented proposed items to the main company’s.• Managed migrate from old system’s equipment to new power system of AC& DC power modernization for MPT.• Preparation of project report of Power modernization plan and civil work renovation at Myanmar.• Implemented the PAT/PAC preparation.

Azmiry-Aim High Co. Ltd.

Power Engineer

2016/02~ 2016/07

Implemented rectifier installation(Huawei,ZTE,Emerson&Eltelk).• Implemented power operation & maintenance center(Power OMC),Monitoring, Integrating and commissioning, Trouble shooting for power.

Sierra K&L Co. Ltd

Site Engineer

2015/09~ 2016/01

EARLY CAREER PROGRESSION