translate翻訳ツール

機械翻訳のため、内容の正確性を保証するものではありません。
正確な翻訳を希望する場合はこちらからバイリンガルを探してください。
arrow_downward
タイトル
メッセージの内容
タイトル
メッセージの内容
確認
メッセージの内容
Loading..
 

メッセージで相談する

  • schedule ステータス:
    受注可能
  • 評価 :
  • 受注実績 : 0件
  • メキシコ
  • お気に入り : 0件
スキル
3Dプリンタ
産業向け専門デザイン
その他
  • 最終ログイン : 2018-05-28
  • 登録日 : 2018-05-28

職歴

詳細

General Motors

Dimensional System Engineer

2016/02~

Cadillac Floor Carpet, Mats, Trunk Trim, Rear Window Trim, Insulators and Electric Brackets
Provide GD&T Mark ups for new or modified parts
Review/Create GD&T 3D Drawing (embedded)
Support or Lead Concept Gage, Design Gage and Build Gage
Risk assessment analysis to confirm dimensional requirements will be meet on new programs
Dimensional Analysis at component interfaces (Overlaps/gaps/Interference/flushness)

General Motors

Senior Design Engineer

2015/08~ 2016/02

Fascia/Grilles/Brackets Fascia
Review Math Data to confirm it is manufacturable and there are not Design issues (meet Design Guides, there are not interference, die locks, correct package, meet dimensional requirements, so on)
Review and Release GD&T Drawing embedded on time
Create/update complete Fascia/Fascia Brackets/Grille/wheel houses assemblies for each grade/version during the design stage to ensure the best interface with other design areas
Manage all Work Orders to be on time
Support to launch Chevrolet Cruze, Main Liaison GM Mexico Plant and OPEL

Ford Motor Company

Console System Integrator Engineer

2014/03~ 2015/08

Support vehicle builds and launch to povide the best design.
Lead BOM Engineer, WERS analyst, PPM, Electric Engineers to meet Console Complexity levels and MRDs
Lead Design Engineer, CAD/CAE Engineer, PMT`s, Purchasing, Financial, Cost Estimating, Supplier, STA, Chief Program, Testing, Plant to launch 2017 MKZ Floor Console that meets milestones deliverables and cost targets.
Manage BOM/WERS system, Engineer Concept, DFMEA, Integrator, Prototype/Production Tool schedule, Team of 5 meeting.
Collaborate with DVP&R (Design Verification Process & Report) team to validate customer requirements

Ford Motor Company

Design and Release Engineer

2012/04~ 2014/03

Lead Design Studio, CAD/CAE, Technical Core Engineers, Supplier, Mold flow, Color & Material, Craftsmanship, Service, Manufacturing, STA, Safety, Ergonomic, Electric Group to design and deliver 2016 Expedition Floor Console
Management DFMEA – SCCAF - Lead PFMEA.

General Motors

Door Trim Design and Release Engineer

2007/05~ 2012/04

Door Trim Design and Release Engineer (2009 –2012).
Responsible for modelling and Design Sunshades Cadillac (CTS 2014). First Sunshade design in-house
Responsible for modelling and Design RR Upr Door Trim Cadillac (CTS 2014)
Responsible for modelling and Design Upr Door Trim Cadillac (ATS 2013)
Responsible for modelling and Design Onstar Bezel (Savana/G-Van)
Work with co-workers to ensure interface and packaging compatibility both internally and externally
Interface with Design Studio, CAD/CAE, BoF, Supplier, Mold flow, Material, Craftsmanship, Manufacturing, Safety, Ergonomic to design deliver

IP and Console Design and Release Engineer (2007- 2009).
Support to launch G3/Aveo Main Liaison GM Mexico and GM Korea (GMDAT)
Support to address Design/Quality Cobalt Issues.
Support to address Design/quality Captiva Issues

Nissan

Supervisor Interior Trim

2000/05~ 2007/05

Lead Successfully Tiida/Versa building and Launch. (US, Europe, Mexico and Latin America Markets)
Lead and address any Design Issue on headliners, hard trim, door trim, trunk trim (Tiida/Versa)
Train and mentor less experienced Engineers in Launching
Improve component performance, reliability and durability to meet key governmental safety requirements
Address and Lead any Design Issue on trim parts for Sentra, Tsuru and Pick up
Main Liaison Nissan Mexico and Nissan Technical Center of Japan during Tiida/Versa Design
Generate cost savings Design ideas and release them to meet the annual company goals
Support Local Parts Development for Renault Clio
Warranty/JDPower Reduction to avoid customer complaint/recalls
Managed, Validation and review test results