NG-National Grid

Electrical Consultant

2016/02~

Provide solution for Electrical System problem encountered during construction and testing
Check if contractors materials, equipment and installation work is in compliance with the approved SEC standard.
Reporting to Head Office Project Engineer of site status and condition of projects.
Make sure of the Quality and Safety of construction site and personnels.
Conduct meeting in relation to coordination, project status and target date of completion.
Making decision encase of conflict on site condition based on approved and applicable standard

Al Robaya Construction

Project Engineer / Engineering Department Estimation Team

2014/01~ 2015/10

1.Attend JobEx meeting and site visit/inspection for project biddings.
2.Material and labor costing of project biddings.
3.Checking of drawings for Abortive works and Variation orders based on the design changes from IFC to
Shop drawings.
4.Prepare cost estimate for change orders to be submitted to client.
5.Quantification of materials based on approved shop drawing to be compared with Bill of Quantities from tender
drawings.
6.Responsible for gathering of data for material submittals and cost as matrix for price comparison and
Consultant/clients approval.
7.Perform DC Hi-pot Testing for Medium Voltage cable.
8.Vendor assistance for Pre-commissioning of Instrument & Electrical equipment including coordination and
scheduling for Proponent witness & inspection.

HYUNDAI ENGINEERING & CONSTRUCTION

Senior QS Engineer

2013/01~ 2014/02

Checking of drawings for Abortive works and Variation orders based on the design changes from IFC to Shop drawings.
• Evaluation of submitted Variation orders and abortive works from sub-contractors.
• Prepare cost estimate for change orders to be submitted to client.
• Attend workshop meeting with regards to design changes.
• Site inspection for installed materials based on sub-contractors monthly progress billing.
• Quantification of materials based on approved shop drawing to be compared with Bill of Quantities from tender drawings.
• Responsible for gathering of data for material submittals and lighting matrix for consultant approval.
• Implements controls over variables affecting job progress to ensure engineering and procurement provide timely delivery of drawings, materials and equipment and to ensure that other corporate programs are fully utilized.